We have had a 2-year plan to move down the coast that's been running for 4 years
well its finally coming to fruition but not without some issues and challenges. Its a down sizing operation to some extent, and I am moving the workshop aka 'studio'
myself, albeit slowly. This move has been coming for quite some time, so all my shelving/racking has been design to be flat packed for ease of moving. Although the floor area is bigger, with everything in boxes on the floor etc its obvious I 'm going to have to erect the shelving fairly quickly as its filling up.

